[ HVAC CONTRACTING ]

HVAC CONTRACTORS IN JEDDAH

AND ACROSS SAUDI ARABIA

We design, supply, install and maintain air conditioning and ventilation, from a single VRF floor to a central chilled water plant.

[ 01 ] WHAT WE DO

AIR CONDITIONING THAT IS ENGINEERED, NOT ASSEMBLED

Green Flash is a mechanical, electrical and plumbing contractor with its head office in Jeddah and projects across every region of the Kingdom. Air conditioning is the largest part of what we build, and we carry it from the first heat load calculation through to the training session on handover day.

Most of the cost of a cooling system is not in the equipment. It is in whether the plant was sized for the building, whether the pipework was coordinated before it was installed, and whether anybody can prove it was tested. That is where our work concentrates.

[ 02 ] SYSTEMS WE INSTALL

FOUR WAYS WE COOL A BUILDING

[ 01 ]

CENTRAL CHILLED WATER

We install air cooled and water cooled plant, primary and secondary pumping, cooling towers and full distribution to air handling and fan coil units. We cover this in detail on our chiller plant page.

[ 02 ]

VRF AND DX

We supply and install Toshiba, LG and Midea VRF for offices, hotels and phased fit outs, plus ducted and split DX where a central plant is not justified. See our VRF systems page.

[ 03 ]

VENTILATION AND SMOKE EXTRACT

We design and install fresh air handling, car park ventilation, kitchen extract, stairwell pressurisation and smoke extract to the Saudi Building Code, and Civil Defence witnesses the testing.

[ 04 ]

CONTROLS AND BMS

We integrate Automated Logic controls and building management, so the plant runs against the actual load instead of simply being switched on in the morning.

[ 03 ] HOW THE WORK RUNS

FROM HEAT LOAD TO HANDOVER

[ 01 ]

HEAT LOAD CALCULATION

We run HAP calculations against the building envelope, occupancy, fresh air and solar gain. Sizing to a rule of thumb is how buildings end up with plant they never use and bills they cannot explain.

[ 02 ]

SHOP DRAWINGS AND COORDINATION

We run clash detection against structure, electrical and fire protection before anything is ordered, so our submittals are approved on the first pass rather than the fourth.

[ 03 ]

INSTALLATION AND TESTING

We pressure test, flush, and balance air and water, and we write the records as the work proceeds rather than reconstructing them at the end.

[ 04 ]

COMMISSIONING AND HANDOVER

We hand over witnessed testing, as built drawings, operation and maintenance manuals, and training for the people who will actually run the system.

[ 04 ] PROOF

FEATURED PROJECTS

The J-One complex for Abdul Latif Jameel Real Estate, where we delivered the mechanical installation across the development.

Toshiba VRF air conditioning at the Abdul Latif Jameel building, supplied and installed as an authorised Toshiba distributor.

More of our work is on the projects page.

[ 05 ] QUESTIONS

WHAT CLIENTS ASK FIRST

Do you work outside Jeddah?

Yes. Jeddah is our head office and we deliver across all regions of Saudi Arabia, including Riyadh, Makkah and the Eastern Province.

Do you supply the equipment as well as install it?

Yes. Green Flash is an authorised distributor for Toshiba and Midea air conditioning in Saudi Arabia, so equipment, installation and warranty sit with one contractor.

Can you take over a project another contractor started?

Yes, after a survey. We record what is installed, test what can be tested, and set out in writing what we can and cannot warrant before we price the completion.

How do you decide what size the system should be?

We size it from a heat load calculation for that specific building, never from an area rule of thumb. We hand over the calculation, its assumptions and its inputs along with the estimate.

[ 06 ] NEXT STEP

TELL US WHAT THE BUILDING NEEDS

Send the drawings, or just the floor area and what the space is used for. We will tell you what the options are and what each one costs to run.

Chat on WhatsApp