We design, supply, install, test and maintain fire fighting systems, from a single wet riser to a full pump room and sprinkler network.
Green Flash designs, installs and commissions fire fighting systems to NFPA standards and the Saudi Building Code, and takes them through Civil Defence approval. We are an electromechanical contractor, so the fire system is coordinated with the mechanical, electrical and plumbing works from the first drawing rather than fitted around them afterwards.
Most fire packages do not fail on the equipment. They fail on the hydraulic calculation, on a pump room that was never fully detailed, or on a fire set drawn over a superseded architectural background. We price and build the system the authority will actually sign.
We install wet and dry systems, and pre action or deluge where the hazard demands it. Our head selection, spacing and density follow the occupancy classification rather than a standard detail sheet.
We supply and install electric and diesel fire pumps with jockey pump, controllers, test header and flow meter loop. Our team details the suction arrangement, ventilation and drainage so the pump room works as a room, not as a schedule.
We install wet and dry risers, landing valves, hose reel cabinets and external hydrants, and we verify flow and pressure at the most remote outlet.
We deliver gaseous suppression for server rooms, data halls and electrical rooms, along with kitchen hood suppression. Our team confirms room integrity and discharge sequencing before we order a single cylinder.
Occupancy classification defines the design density, the area of operation and the sprinkler head spacing. To ensure maximum reliability and code compliance, our hydraulic calculations are always based on real world water supply conditions rather than estimates.
We prepare comprehensive fire protection drawing sets based on the latest architectural drawings, fully coordinated with structural elements, ductwork and containment, and we submit them alongside matching engineering calculations.
We install, support and hydrostatically test pipework section by section, recording results progressively rather than reconstructing them at the end.
We verify pump performance curves and witness flow tests. Our team validates the fire alarm system cause and effect matrix and hands over the final documentation, including the official Civil Defence approval.
We have completed over 21 major projects across the Kingdom, supported by teams operating in Jeddah, Riyadh, Yanbu, Rabigh and King Abdullah Economic City. Our fire protection expertise spans the industrial, commercial, healthcare, infrastructure, defence and logistics sectors.
Key projects include delivering comprehensive fire fighting and fire alarm packages for Pharma Care in pharmaceutical manufacturing, for Abdul Latif Jameel Real Estate on the J-One development, and for AACC aircraft component facilities near Jeddah airport.
As an authorised EDWARDS fire alarm distributor in Saudi Arabia, we provide an end to end service, supplying and commissioning both detection and alarm and suppression systems in house.
Yes. We prepare the drawings and hydraulic calculations, make the submission, answer the comments and see the system through to approval. You are not left to chase the authority between contractors.
Yes. We supply the pump set and build the pump room around it, including the controller sequence, test header, ventilation and drainage. The pump is commissioned against its performance curve and witnessed.
Yes, after a survey. We record what is installed, pressure test what can be tested, identify what does not match the approved drawings, and give you a written position before we price the remaining work.
Yes. Scheduled inspection and testing of pumps, valves, sprinkler networks and suppression systems, with records kept in a form the authority and your insurer will accept.
Send the drawings, or just the floor area, the occupancy and the water supply you have. We will tell you what the system needs and what it will take to get it approved.