We deliver mechanical, electrical and plumbing systems for factories and industrial facilities across Saudi Arabia, sized for the process rather than the floor area.
Industrial cooling follows the heat the process rejects and the equipment in the room, not the square metres. Ventilation follows what is released into the air. Power follows the connected load of the machines, and the fault level they create.
Get those wrong and the plant is either undersized and failing in summer, or oversized and expensive to run for its whole life. This is where calculation earns its keep.
Green Flash Engineering and Contracting delivers MEP systems for factories and industrial facilities across Saudi Arabia, including pharmaceutical manufacturing and aerospace component production in Jeddah. Process cooling and cold storage are delivered as refrigeration, and the incoming supply as electrical substations.
We supply and install industrial chillers, pumps and the distribution that carries the load to where the process needs it.
Process extract, make up air and general ventilation, designed together because extracting air without replacing it does not work.
High and low voltage distribution, containment and underground cabling, sized against the real connected load.
Fire protection to the hazard classification, and complete civil works where the scope calls for structure as well as services.
We build the load from the equipment schedule and the process, then size plant and cable against it with the calculation handed over.
In a working factory the programme is built from what production can release. We plan the phasing around that rather than assuming a clear site.
Underground routes are tested and recorded before they are covered, because finding a fault afterwards is measured in excavation.
Plant is proven against design intent and handed over with records the maintenance team can actually use.
We have delivered three separate packages for an aircraft component manufacturer in Jeddah: complete civil and MEP for a paint booth facility, a chiller system with pumps, and underground power cables to the main factory.
We also supplied and commissioned industrial chillers at the Jawdah factory in Jeddah, delivered the Pharma Care factory HVAC, and supplied the VRF system for the Al Mabani administration building in Riyadh.
Yes. The programme is built around what production can release, in phases where needed.
Yes. On the paint booth facility the scope was complete civil and MEP, which removes the interface where openings and service routes usually go wrong.
From the process heat rejection and the equipment in the room, never from an area rule of thumb. The calculation is handed over with the estimate.
Yes, including route, protection and testing before backfill, with records kept so the route can be found again.
Send the equipment schedule and the layout, or just the building and what it manufactures. We will come back with what the services need to be.