[ HOW WE WORK ]

PROJECT CONTROLS

AND ERP

Most MEP projects do not fail on installation. They fail on coordination: a long lead item ordered late, a variation nobody priced, a drawing revision that reached site after the work was done.

[ 01 ] WHY IT MATTERS

ONE RECORD PER PROJECT, NOT FIVE SPREADSHEETS

We run our projects through an ERP system rather than through spreadsheets and inboxes. Every project has one record, and the budget, the purchase orders, the deliveries, the manpower and the documents all hang off it.

That matters to a client for one reason. When you ask where something stands, the answer comes from the same place the site team is working from, not from someone reconstructing it the night before the meeting.

[ 02 ] WHAT IT CONTROLS

FOUR THINGS WE TRACK ON EVERY PROJECT

[ 01 ]

COST AGAINST BUDGET

Committed cost is recorded when the order is placed, not when the invoice arrives. That is the difference between knowing a package is overrunning in week six and finding out in week twenty.

[ 02 ]

PROCUREMENT AGAINST THE PROGRAMME

Chillers, switchgear, pumps and fire alarm panels carry long lead times. Each one is tied to the date it is needed on site, so a slipping delivery shows up as a programme risk while there is still time to act.

[ 03 ]

VARIATIONS AND CLAIMS

A variation is logged when it is instructed, with what changed and what it costs. Unlogged variations are the most common reason an MEP account closes badly for both sides.

[ 04 ]

DOCUMENTS UNDER VERSION CONTROL

Drawings, submittals, method statements and test records sit against the project with a revision history, so site is never working from a superseded drawing.

[ 03 ] WHAT YOU SEE

REPORTING YOU CAN ACT ON

[ 01 ]

PROGRESS AGAINST PROGRAMME

Percentage complete by system and by area, measured against the baseline rather than against optimism. You see where the job actually is.

[ 02 ]

A LIVE PROCUREMENT STATUS

What is ordered, what has shipped, what has landed and what is still open, with the dates each one is needed. No separate chase required.

[ 03 ]

AN OPEN ITEMS REGISTER

Non-conformances, outstanding approvals, pending information and snags, each with an owner and a date, carried through to close out rather than quietly dropped.

[ 04 ]

A HANDOVER PACK THAT IS ALREADY BUILT

Because test records and as built drawings are filed against the project as the work happens, the handover documentation is assembled, not reconstructed at the end.

[ 04 ] WHERE IT SHOWS

THE PROJECTS THAT NEED IT MOST

On a single villa, coordination can live in somebody’s head. On the SAMREF refinery buildings in Yanbu, where we worked inside a main contractor’s programme and permit system, or on the Rabigh power plant fire protection, it cannot.

The same applies to phased work. Three separate packages for the same aerospace client at AACC in Jeddah only stayed straight because each had its own record, its own budget and its own procurement schedule.

[ 05 ] QUESTIONS

WHAT CLIENTS ASK FIRST

Which ERP system do you use?

We do not publish the product, because it is not what affects your project. What matters is that one system holds the budget, the procurement, the programme and the documents for your job, and that the reporting you receive comes out of it.

Can we get reporting in our own format?

Yes. Most clients and main contractors have a reporting template they want used. We populate it from our own records rather than asking you to adopt ours.

How often is progress reported?

Weekly as standard, with a monthly cost and procurement review. On fast track work we report more often, and we agree the cycle before the project starts.

Do you work inside our systems if we require it?

Yes. On projects where the main contractor runs a common data environment or a permit to work system, we work inside it and keep our own records in step.

[ 06 ] NEXT STEP

ASK HOW WE WOULD RUN YOUR PROJECT

Tell us the scope and the programme. We will set out how the work would be packaged, what the long lead items are, and what reporting you would receive and when.