Fire protection system supplied and installed on the Rabigh 2 Mourjan IPP power generation plant expansion, delivered in 2026.
Green Flash supplied and installed the fire protection system for the Rabigh 2 Mourjan independent power producer expansion. Power generation is among the most demanding environments for fire protection: the fuel, the plant and the consequence of an outage all raise what the system has to do.
A fire package on a generation plant is judged on its hydraulics and its documentation. The design density, the area of operation and the water supply have to hold up under review, and the whole system has to satisfy Civil Defence before it is signed off.
We supplied and installed the fire protection system for the plant expansion.
Hazard classification drives the design density and the area of operation. We work to NFPA and the Saudi Building Code rather than a standard detail sheet.
Our hydraulic calculations are built on the actual water supply conditions available on site, not on an assumed figure that fails at witness testing.
We prepare the drawings and calculations, make the submission, answer the comments and see the system through to Civil Defence sign off.
Everything downstream follows from the occupancy and hazard classification. Getting it wrong means a system that is either unsafe or unaffordable.
Sprinkler branches are coordinated against structure, ductwork and containment at drawing stage, on the current architectural background.
Pipework is hydrostatically tested in sections with results recorded progressively, not reconstructed at the end of the job.
Pump curves verified, flow tests witnessed, and the cause and effect matrix proven against the alarm and mechanical systems.
A sprinkler layout that would pass in a commercial building will not survive review on a generation plant. The hazard is different, the water supply is different, and the authority asks harder questions.
Our fire work also covers the refinery buildings in Yanbu, and we are an authorised EDWARDS fire alarm distributor, so detection and suppression can be supplied and commissioned by the same contractor.
Yes. We supplied and installed the fire protection system on the Rabigh 2 Mourjan IPP expansion, and we have delivered civil and MEP works at a refinery in Yanbu.
Yes. Drawings, hydraulic calculations, the submission itself, the comments and the follow through to approval.
Yes. We are an authorised EDWARDS fire alarm distributor in the Kingdom, so both sides are supplied and commissioned in house and the interfaces are proven by one team.
Yes. Scheduled inspection and testing of pumps, valves and networks, with records kept in a form the authority and your insurer will accept.
Send the layout, the hazard and the water supply you have. We will tell you what the system needs and what approval will involve.