We deliver mechanical, electrical and plumbing systems for hospitals, clinics and pharmaceutical manufacturing across Saudi Arabia, where the services are part of how the building performs clinically.
In most buildings the air system keeps people comfortable. In a hospital or a pharmaceutical facility it controls infection risk and product quality, so temperature, humidity, filtration and the pressure relationship between rooms all carry clinical weight.
That changes what a contractor has to produce. The design has to be defensible, the installation has to match the design that was approved, and the records have to survive an auditor reading them a year later.
Green Flash Engineering and Contracting delivers MEP systems for hospitals, pharmacies and pharmaceutical facilities across Saudi Arabia, engineering to ASHRAE, NFPA and HTM alongside the Saudi Building Code. Our scope on these buildings includes medical gas pipeline systems and the refrigeration that pharmacy, laboratory and mortuary storage depends on, both named on our ISO certification.
We install air handling plant, chilled water and ventilation sized from a heat load calculation for that building, with the pressure regimes the spaces require.
We deliver sprinkler and suppression systems and addressable detection, taken through Civil Defence approval.
We install distribution, lighting, small power and containment, including the standby arrangements a facility that cannot stop depends on.
Water supply, drainage and the pipework distribution that clinical and manufacturing areas rely on, installed and tested to the Saudi Building Code.
We calculate the load against the building, the process and the occupancy, and we hand over the calculation with its assumptions rather than just the result.
Services are clash detected against structure and each other at shop drawing stage, which matters more in healthcare because ceiling voids are crowded and access is restricted.
Air and water balancing, pressure tests and electrical testing are recorded progressively, not reconstructed at handover.
As built drawings, operation and maintenance manuals, test records and training for the people who will run the facility.
We delivered a complete HVAC design and build for the Pharma Care pharmaceutical factory in Jeddah, covering chillers, air handling units, fans and ductwork.
We also delivered the MEP works for the pharmacy at Hala Bin Laden Hospital in Jeddah. Both sit within more than 21 projects across the Kingdom, with teams working from Jeddah, Riyadh, Yanbu, Rabigh and King Abdullah Economic City.
Yes. We delivered the HVAC system for a pharmaceutical manufacturing facility in Jeddah as a design and build package, and MEP works for a hospital pharmacy.
Work in a live clinical building is phased around what the department can release, with containment and access agreed before anything starts.
Both. We build to an issued consultant design, and we also take design and build packages where the client wants one contractor accountable for both.
Yes. Drawings, hydraulic calculations, the submission, the comments and the follow through to approval.
Send the drawings, or just the building type and what happens inside it. We will come back with what the services need to be and where the approval risk sits.
All Rights Reserved © Designed by Green Flash