[ SECTOR ]

POWER AND

INFRASTRUCTURE

We deliver fire protection, power distribution and complete civil and MEP works on generation, refinery and infrastructure projects across Saudi Arabia.

[ 01 ] WHY THIS SECTOR IS DIFFERENT

THE HAZARD AND THE CONSEQUENCE ARE BOTH LARGER

On a generation plant or a refinery the fuel, the plant and the cost of an outage all raise what the systems have to do. A sprinkler layout that would pass in a commercial building will not survive review here.

These clients also judge a contractor on documentation and predictability as much as on installation. The calculation has to hold up, and the records have to be there when the authority asks.

Green Flash Engineering and Contracting delivers fire protection and electrical infrastructure on power generation and refinery projects in Saudi Arabia, including the Rabigh 2 Mourjan IPP expansion and the SAMREF refinery at Yanbu. Power distribution on projects of this type runs through electrical substations, transformers and MV switchgear.

[ 02 ] WHAT WE DELIVER

HEAVY INDUSTRIAL SCOPE

[ 01 ]

INDUSTRIAL FIRE PROTECTION

Fire protection systems designed to the hazard classification, with hydraulics built on the water supply that is actually available.

[ 02 ]

UNDERGROUND POWER CABLES

High and low voltage underground distribution, tested and recorded before backfill.

[ 03 ]

COMPLETE CIVIL AND MEP

Where the scope calls for it we take structure and services together, so the openings and builder’s work the services depend on sit with the same contractor.

[ 04 ]

DETECTION AND LIFE SAFETY

Addressable detection interfaced to the mechanical and suppression systems, proven at commissioning against a written matrix.

[ 03 ] HOW THE WORK RUNS

TO THE STANDARD THE AUTHORITY WILL SIGN

[ 01 ]

HAZARD CLASSIFIED FIRST

Occupancy and hazard classification set the design density and the area of operation. Everything downstream follows from getting that right.

[ 02 ]

CALCULATED ON REAL CONDITIONS

Hydraulic calculations use the site’s actual water supply, not an assumed figure that fails at witness testing.

[ 03 ]

TESTED IN SECTIONS, RECORDED AS WE GO

Pipework is hydrostatically tested section by section and cable routes proven before cover, with results recorded progressively.

[ 04 ]

WITNESSED AND APPROVED

Pump curves verified, flow tests witnessed, cause and effect proven, and the system taken through to Civil Defence sign off.

[ 04 ] PROOF

WHAT WE HAVE DELIVERED IN THIS SECTOR

We supplied and installed the fire protection system for the Rabigh 2 Mourjan IPP power generation plant expansion, and delivered complete civil and MEP works on two refinery buildings in Yanbu for main contractor SAS Systems Engineering.

We also installed underground power cables at Amaala on the Red Sea, and at an aircraft component factory in Jeddah.

[ 05 ] QUESTIONS

WHAT CLIENTS ASK FIRST

Do you work on power generation sites?

Yes. We supplied and installed the fire protection system on the Rabigh 2 Mourjan IPP expansion in 2026.

Have you worked on refinery projects?

Yes. Complete civil and MEP works on two buildings at a refinery in Yanbu, delivered for the main contractor across 2025 and 2026.

Do you work as a subcontractor to a main contractor?

Yes, and regularly. We are comfortable working inside another contractor’s programme and reporting into their site management.

Who handles the Civil Defence submission?

We do. Drawings, hydraulic calculations, the submission, the comments and the follow through to approval.

[ 06 ] NEXT STEP

TELL US WHAT THE SITE INVOLVES

Send the layout, the hazard and the water supply, or just the type of plant and where it is. We will come back with how we would run it.

Chat on WhatsApp