[ SELECTED WORK ]

DELIVERED ACROSS

THE KINGDOM

Eighteen projects delivered across Saudi Arabia, from refinery buildings and power plant fire protection to pharmaceutical manufacturing, factories, hospitals and residential compounds. We also set out how we work by sector: healthcare and pharmaceutical, industrial and manufacturing, retail, hospitality and residential, and power and infrastructure.

[ 01 ] PROJECTS

EIGHTEEN PROJECTS, SIX LOCATIONS.

01

SAMREF refinery security buildings, Yanbu

Complete civil and MEP works. SAS Systems Engineering, 2026.
02

SAMREF refinery search facility building, Yanbu

Complete civil and MEP works. SAS Systems Engineering, 2025 to 2026.
03

Rabigh 2 Mourjan IPP expansion

Fire protection system supplied and installed on a power generation plant expansion. Rabigh, 2026.
04

Pharma Care factory

Design and build of a new HVAC system: chillers, air handling units, fans and ductwork. Jeddah, 2026.
05

AACC paint booth facility

Complete civil and MEP works. Aircraft and Accessories Component Company, Jeddah, 2025 to 2026.
06

AACC chiller cooling system

Chiller system and pumps supplied and installed. Aircraft and Accessories Component Company, Jeddah, 2025.
07

AACC main factory

Underground power cables. Aircraft and Accessories Component Company, Jeddah, 2025.
08

J-One compound

VRF supplied and installed across four apartment buildings. Abdul Latif Jameel Lands, Jeddah, 2025.
09

Dari Q1

Ventilation system renovation. Abdul Latif Jameel Lands, Jeddah, 2026.
10

Al Mabani administration building

VRF system supplied. Al Mabani, Riyadh, 2026.
11

Jawdah factory

Industrial chillers supplied and commissioned. Jawdah Industrial Company, Jeddah, 2025.
12

Hala Bin Laden Hospital pharmacy

MEP works. Al Motaheda Pharmacy, Jeddah, 2024 to 2025.
13

Amaala, Red Sea

Underground power cables. Economics Homes for Contracting, 2024 to 2025.
14

Panda hypermarket, KAEC

Air conditioning units supplied, installed and commissioned. Panda Hypermarkets, King Abdullah Economic City, 2025.
15

Residential complex and villas

Design and build HVAC: VRF, fresh air handling, piping, ductwork and kitchen hoods. PB Contracting, Jeddah, 2024 to 2025.
16

CARTL restaurant

Toshiba VRF system supplied and commissioned. Al Hafar Contracting, Jeddah, 2024.
17

Hayy Jameel

HVAC system inspection. Fann Jameel for Arts, Jeddah, 2025.
18

ERAM residential apartments

Air conditioning units supplied for residential apartments. ERAM Real Estate Developers, Jeddah, 2026.

Our teams work from Jeddah, Riyadh, Yanbu, Rabigh, King Abdullah Economic City and Amaala on the Red Sea, across HVAC, fire protection, electrical, plumbing, civil and infrastructure works. Four of these are written up in detail: the refinery buildings in Yanbu, the aircraft component factory in Jeddah, the pharmaceutical factory HVAC, and fire protection on the Rabigh power plant expansion.

[ NEXT STEP ]

WANT REFERENCES FOR A SIMILAR BUILDING?

Tell us the building type and we will share the closest project we have delivered.

Chat on WhatsApp